Deck permits in Shepparton are simpler than most owners expect once the two kinds of approval are separated. In Victoria a deck generally needs a building permit whatever its size, issued by a registered building surveyor, while a planning permit from Greater Shepparton City Council is needed only in some cases, such as a deck more than 800mm above the ground, a smaller residential lot or a block covered by a flood or heritage overlay. Shepparton Decking plans the approvals into every deck it builds across Shepparton, Mooroopna, Kialla and the surrounding district, so drawings, engineering, the permit and the inspections are arranged before work starts and the finished deck is signed off. Call 0485 032 128 for a free measure and a written quote that includes the approvals your deck needs.
GET A FREE QUOTE
Shepparton Decking
Deck permits Shepparton owners ask about start with one question: does the deck need a building permit? In Victoria, the answer is almost always yes. The Victorian Building Authority's guidance on when a building permit is required states that decks attached to a building such as a house or swimming pool need a building permit irrespective of size, and that detached decks built as an amenity to a building need one too. Some councils say it more plainly: a building permit is needed to build a deck regardless of its size.
That surprises many owners, because a widely repeated rule says decks under 800mm high do not need a permit. That 800mm figure is real, but it belongs to planning permits, not building permits, as the next section explains. A registered building surveyor confirms what each project needs, and checking before work starts is far cheaper than fixing an unapproved deck later.
An attached deck is fixed to the house, usually with a ledger bolted to the house frame, and it changes how the house is used and how loads reach its structure. A freestanding deck stands on its own footings next to the house, a pool or a garden feature. Under the Victorian Building Authority's guidance both kinds need a building permit when they serve a home or pool, so making a deck freestanding is not a way around approval. The difference matters for design instead: an attached deck relies on a sound connection to the house and flashing to keep water out of the wall, while a freestanding deck must be braced on its own.
Not every job on an existing deck needs a new permit. The Victorian Building Authority's guidance exempts repair, renewal and maintenance of part of an existing building when the work does not affect its structural soundness, does not change its floor area or height, does not underpin or replace footings or remove members that support other parts, and uses materials commonly used for the same purpose. Replacing worn boards or a few rotten joists on a sound deck often fits within that. Rebuilding the frame, replacing footings, enlarging the deck or raising it usually does not. A building surveyor confirms where a particular job sits, and the deck repairs page covers the repair work itself.
Shepparton Decking
Council approval for a deck is really two separate approvals, a building permit and a planning permit, and owners often use the phrase for both. The building permit, issued by a registered building surveyor, checks that the deck is safe and built to the building regulations and the National Construction Code. A planning permit, issued by Greater Shepparton City Council under its planning scheme, checks whether the deck suits the site, the neighbourhood and any controls on the land. Most decks need the first; only some need the second.
This is where the 800mm rule belongs. Council guidance in Victoria explains that a planning permit is often not required for a deck associated with a house when its finished floor is no more than 800mm above ground level and the residential lot is more than 300 square metres. A deck that is higher than that, sits on a smaller residential lot, or is on land with an existing planning permit or more than one dwelling may need a planning permit as well as a building permit. Height is measured from the ground under the deck, so on a sloping or uneven block the lowest corner is checked, not just the step at the back door. The elevated decks page covers higher decks in more detail.
Overlays in the Greater Shepparton Planning Scheme can require a planning permit for a deck that would otherwise not need one. Flood-related overlays cover parts of Shepparton, Mooroopna and land along the Goulburn and Broken rivers, where the council and the catchment management authority may set conditions on floor levels, footings and anything that could obstruct floodwater. Heritage overlays apply to some older streets and buildings, where the look of a deck visible from the street can matter. Vegetation and tree protection controls can also apply where footings would sit near significant trees. The overlays on a block are listed on its planning property report, which is checked before a deck is designed.
Shepparton Decking
The deck permit process follows the same order for most homes: design, documents, approval, then building with inspections along the way. Planning it into the project from the first measure means the permit is ready when the build is due to start.
A building permit application for a deck usually includes a site plan showing the deck's position and its distance to boundaries, floor plans and elevations, framing and footing details, and the balustrade and stair design. Larger, higher or more complex decks, and decks on reactive clay or near pools, often need a structural engineer to specify footing sizes, posts, bracing and connections. The registered building surveyor checks the documents against the building regulations, the National Construction Code and any planning permit, then issues the building permit. Building work is not started until the permit has been issued.
The building permit lists the stages at which the building surveyor must be notified to inspect the work, which for a deck commonly include the footings before concrete is poured, the frame before it is covered, and completion. Each inspection is booked as the build reaches that stage. Once the final inspection is passed, the surveyor issues a certificate of final inspection, or an occupancy permit where the building permit requires one. That paperwork is worth keeping, because buyers and their inspectors ask for it when a house is sold.
Shepparton Decking
Building rules a permitted deck must meet cover where it sits on the block and how it keeps people safe. The building surveyor checks both before issuing the permit, so they are built into the design rather than fixed afterwards.
Victoria's siting rules control how close a deck can be built to boundaries, how much of the lot is covered and how a raised deck affects neighbours. Under the residential overlooking standard, a deck should be designed to avoid direct views into a neighbour's secluded private open space and habitable room windows within 9 metres, measured within a 45 degree angle and from 1.7 metres above the deck floor. The standard does not apply where the deck faces a boundary with a visual barrier at least 1.8 metres high and the deck floor is less than 0.8 metres above ground at the boundary. Where it does apply, fixed screens to at least 1.7 metres above the floor, with no more than 25 per cent openings, are a common answer. Easements are checked too, because building over one usually needs the consent of the authority that owns it. The deck privacy screens page covers screening in more detail.
Under the National Construction Code, a deck floor more than one metre above the ground needs a balustrade at least one metre high, with openings small enough that a young child cannot pass through, and stairs must have consistent risers and goings within set limits, with handrails where required. Where a deck forms part of a swimming pool or spa barrier, the pool safety rules also apply: in Victoria, pools and spas that can hold more than 300mm of water must be registered with the council and have a compliant barrier, with a barrier compliance certificate lodged every four years. A deck that lets a child climb into the pool area can make a compliant barrier fail, so the two are designed together. The pool decking page explains pool decks in more detail.
Shepparton Decking
Pergolas, roofs and verandahs over a deck are assessed under their own rules. The Victorian Building Authority's guidance exempts a pergola from a building permit when it is an open, unroofed structure, which may have open-weave permeable covering, is not more than 3.6 metres high, has a floor area of not more than 20 square metres and sits no further forward than 2.5 metres in front of the front wall of the house. Even then, it must be designed to carry its loads and must not harm the building it is attached to.
Adding a solid roof changes the picture. A roofed structure is no longer a pergola under that definition, so a verandah or alfresco roof over a deck generally needs a building permit, and it is often designed and permitted together with the deck so the posts, beams and footings work as one structure. Roofing near a boundary also brings the siting rules into play. The alfresco decks page covers covered entertaining decks.
Shepparton Decking
Deck permit cost and timeframes in Shepparton depend on how many approvals a deck needs and how complex it is. A building permit alone is the most common case. The cost is made up mainly of the building surveyor's fee, which reflects the size and complexity of the deck and the number of inspections, plus the drawings and any engineering. Government levies and council lodgement charges can apply on top. A planning permit, when one is needed, adds council application fees and further documents, and a flood overlay can add a referral to the catchment management authority.
Timing follows the same pattern. A building permit has no fixed statutory timeframe: the building surveyor assesses the application once complete drawings and any engineering are in hand, so a straightforward deck with full documents is usually the quickest approval, and missing details are the most common cause of delay. A planning permit runs to a statutory clock. Under the Planning and Environment Act 1987, the council has 60 statutory days to decide an application, and that clock pauses while the council waits for further information it has requested or while the application is on public notice to neighbours. The building permit can only be issued once any planning permit is in place, so where one is likely, the planning application is lodged first and early.
Every quote lists the approvals the deck is expected to need and what has been allowed for them, so the owner can see the permit costs and timing alongside the build itself.
Shepparton Decking
Decks built without a permit are common on older properties, and they often come to light when a house is sold and the buyer's inspector or conveyancer asks for the permit and final certificate. An unapproved deck can also raise questions with insurers, and the council can issue a building notice or order requiring work on unpermitted building work.
The usual starting point is to have a registered building surveyor inspect the deck and advise. Depending on its condition and how it was built, the options can include documenting and approving the work, upgrading parts that do not comply, such as a low balustrade, undersized footings or posts sitting in the soil, or removing and rebuilding the deck. When an old deck is being replaced anyway, the simplest path is often a new, permitted deck built to current rules. The timber decking page covers new deck builds.

The site, levels and boundaries are measured, the deck is designed, and the block is checked for overlays, easements and siting limits. The owner receives a written quote that lists the drawings, engineering, building permit and any planning permit the deck needs.

Drawings and, where required, engineering are prepared and lodged with a registered building surveyor, together with a planning application to the council if one is needed. Building starts once the building permit has been issued.

The deck is built to the approved drawings, with the building surveyor inspecting at the stages set on the permit, usually the footings, the frame and completion. The owner receives the final sign-off paperwork with the finished deck.
Almost always. Victorian Building Authority guidance says attached decks need a building permit irrespective of size, and detached decks built as an amenity to a home need one too. A registered building surveyor issues the permit and confirms the requirements for each deck.
Not from a building permit. The 800mm figure is a planning threshold: a planning permit is often not needed for a deck no more than 800mm above ground on a residential lot over 300 square metres. A building permit is still generally required.
Often not. Repairing or renewing part of a deck with similar materials is usually exempt if it does not affect the structure, change the size or height, or replace footings. Rebuilding the frame or enlarging the deck generally needs a permit.
A registered building surveyor, either private or at Greater Shepparton City Council, issues building permits. A planning permit, when needed, comes from the council's planning department under the Greater Shepparton Planning Scheme.
A building permit has no fixed timeframe and is usually quickest when drawings and engineering are complete. A planning permit, if needed, has a 60 statutory day decision period, which pauses while further information is requested or neighbours are notified.
An open, unroofed pergola can be exempt if it is no more than 3.6 metres high, no more than 20 square metres and not too far in front of the house. A solid roof generally makes it a structure that needs a building permit.
GET A FREE QUOTE
BUSINESS
SERVICES
OPERATING HOURS
Sun: 7:00am - 9:00pm
Mon: 7:00am - 9:00pm
Tue: 7:00am - 9:00pm
Wed: 7:00am - 9:00pm
Thu: 7:00am - 9:00pm
Fri: 7:00am - 9:00pm
Sat: 7:00am - 9:00pm